Pouring the thinset for a base for the pan to better level it:
Here is the pan with drain installed:
Here is the enclosure with a layer of plastic and the shelf framed in:
And the final product. The cementboard is up for the tile and the fan is installed and vented to the outside.
I have also finished all the prep work for the taping and mudding. I have gone through and check the screws, cut out broken board and pre-filled large gaps, holes and very uneven joints.
No comments:
Post a Comment